Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Open the Project form and select the Drawings tab.

Add a drawing

  • Right-click the gray field and select “Add.”

Image Removed

Engineers often find themselves engaged in complex and iterative processes, especially when it comes to tasks like drafting shop drawings. In such scenarios, employing a Kanban board can significantly enhance an engineer's efficiency and overall job satisfaction. Kanban, rooted in Agile project management principles, provides a visual and flexible framework that aligns seamlessly with the iterative nature of drafting shop drawings.

One of the primary benefits of utilizing a Kanban board lies in its ability to provide a clear and transparent overview of the entire workflow. Engineers can visualize the different stages involved in the drafting process, from initial design to final review, on a single board. This transparency not only helps in tracking the progress of each task but also enables the identification of potential bottlenecks and areas for improvement. By having a visual representation of the workflow, engineers can prioritize tasks, allocate resources effectively, and ensure a smoother progression of the project.

Table of Contents
image-20240120-174616.pngImage Added

Using the Kanban Board to Manage your Drawings

Step_01.pngImage Added

Add a New Drawing:

Click the green plus-sign button (blue star) to create a new drawing, then choose the project you’re creating the new drawing record for.

image-20240120-175045.pngImage Added

Select the type of drawing from the list.

image-20240120-175224.pngImage Added

And give it a name/description.

image-20240120-175946.pngImage Added

Once you’ve created a drawing record, you can manage the record in greater detail from the Drawings form, which shows you drawings globally from all your projects, or by navigating to: Project->Drawings.

Step_02.pngImage Added

What Date is Important to You?

From the Date dropdown, choose what date you want to see on each drawing card.

image-20240120-181628.pngImage Addedimage-20240120-183556.pngImage Added

Step_03.pngImage Added

How do you want to sort your Kanban board?

In addition to the avatar representing who the drawing is assigned to, you can select an additional role, and if that role has someone assigned to toe project, their avatar will display.

image-20240120-183841.pngImage Added
Step_04.pngImage Added

Who’s the Project Manager Associated with this Drawing?

In addition to the avatar representing who the drawing is assigned to, you can select an additional role to display.

image-20240120-183459.pngImage Addedimage-20240120-183627.pngImage Added

Step_05.pngImage Added

See how many tasks are assigned/completed on the drawing.

Each drawing card will display the total number of tasks completed/assigned.

image-20240120-184800.pngImage Added

Step_06.pngImage Added

Hover over a drawing to see a flyout with additional details.

See important date history, additional people assigned to the project, the current status, or even click a link to take you directly to the parent project.

  1. Click the Data tab to see important tracking dates, or user-defined-columns you’ve added to your drawings.

  2. Click the Notes tab to see existing notes or add additional notes. Clicking the project link will take you directly to the project.

    1. Right-click to Add, Edit, or Delete notes.

image-20240120-201540.pngImage Addedimage-20240120-192734.pngImage Added

Step_07.pngImage Added

Use global filters to focus on what’s important to you.

As the number of active projects grows, you may want to filter your results to focus on just a particular status, or perhaps a single project. Utilizing Filters gives you the ultimate flexibility to see just the data that is important to you.

image-20240120-193909.pngImage Addedimage-20240120-194500.pngImage Added


Drag-and-Drop to Update a Drawing’s Status

The iterative nature of drafting shop drawings often involves multiple rounds of review and approval from clients. Kanban's flexibility allows engineers to adapt to changes seamlessly. Tasks can be easily dragged-and-dropped from one status to another as needed, providing the agility required for the dynamic nature of the review and approval process. This adaptability ensures that the project stays on track despite revisions and feedback, ultimately leading to faster turnaround times. Crows Nest automatically updates key dates making the Engineer/Drafter’s job much quicker and easier.

Furthermore, the collaborative nature of Kanban fosters better communication within the engineering team and with clients. Engineers can easily communicate updates, changes, or challenges through the Kanban board, creating a shared understanding of the project status. This collaborative approach not only streamlines communication but also promotes a sense of accountability among team members.

Drawings-Drag-and-Drop.gifImage Added

In conclusion, incorporating a Kanban board into the project management workflow for drafting shop drawings can greatly benefit engineers. The visual transparency, adaptability to changes, and enhanced collaboration provided by Kanban align perfectly with the iterative nature of the engineering process, resulting in increased efficiency and overall project success.


  • Type text name and press Enter.

Image RemovedImage Added
  • New drawing item appears in the list. There are a number of columns that can be customized.

Additionally, the right-hand pane allows for more tabs to further customize your Drawing. You can add custom notes to a Drawing, as well as Tasks, Revisions, Pictures, and more.

Image RemovedImage Added

Drawing


XDrawing status

Left-click on “Status” field (Default) to open Drawing Status window.

Right-click the list and select “Add” to enter status name.

Status font and background color can be customized for visual cues.


Drawing properties

Property

Explanation

Type

“Select Drawing Type” window

Group

optional

free text field, organize drawings into groups

Number

automatic

identifying number assigned by application

Rev

automatic

revision number

No

optional

alphanumeric field, edit directly to add a unique identifier

Description

optional

alphanumeric field, edit directly, descriptive name

Status

“Drawing Status” window

Date fields:

  • Target

  • Started

  • Submitted

  • Returned

  • Required (by)

Left-click to open “Select a Date/Time” window

Edit the Date field, or select from calendar

Action Required By

optional

“Select Action Required By” window

Vendor

optional

“Select Vendor” window

Text fields:

  • Comments

  • Notes

  • Hours

optional

alphanumeric fields, edit directly as desired