Labor Departments & Operations
Introduction
Labor Departments inherit their Regular Time (RT) and overtime Rates (OT) from their respective Category.
An example of a Department within the Production Category could be a Planning Department.
Â
Â
Setting Labor Departments
Labor Departments are set under Settings → Options → Labor.
Right click on a category and select either Add a Department or Add Existing Department
Multiple Departments can be assigned to the same Category.
Introduction
Labor Operations inherit their Regular Time (RT) and overtime Rates (OT) from their respective Category.
An example of a Operation within the Production Department could be Cutting.
Â
Labor Departments are set under Settings → Options → Labor.
Right click on a Category and select Add Operation.
Multiple Operations can be assigned to the same Department.
Â
Â