Termed as properties, attributes, or metadata, the 23 built-in, standard fields serve as designated spaces to store intricate details about your drawings.

Below is a list of each field and the name that will appear in the column header.
(unless given an alias in Settings->Options->Drawings)

User-Defined Pick Lists

Pick List

Required/
Optional

Explanation

TypeRequired

Select Drawing Type from Pick List. Types are created to align with your organization’s needs.

image-20240122-194202.pngImage Modified

Anchor
Status
Status
Status

Required

Statuses represent the current state of the drawing along its lifecycle, such as “To Do”, “In Progress”, or “Done” and are represented visually on the Kanban board as “Swimlanes”. Statuses are created by your organization to align with desired workflow. New records inherit the status that is set to ‘Default’.

image-20240122-193234.png

...

Dates

Explanation

Users can enter dates manually or allow the system to update them automatically, based on formulas.
All date fields associated with Drawings can be formulated.

Additionally, each of these system dates for tracking drawings can be aliased (e.g., “Target Date” can be labeled “Client Deadline”, or just “Target”, to shorten the width of the header.)

Target Date

The date you are intending to get the drawing to your customer/client. As with the other dates, this date can be set to compute automatically based on a formula.

image-20240122-213624.png

Anchor
DateStarted
DateStarted
Date Started

The date the Engineer/Drafter begins work on the drawing. This date can be set manually or set to automatically update when the status of the drawing gets changed (e.g., from Not Started to In Progress).

Date Submitted

The date the drawing is submitted to the customer/client. This date can be set manually or set to automatically update when the status of the drawing gets changed (e.g., from In Progress to In Submitted).

Anchor
DateRequired
DateRequired
Date Required

The date you want the drawing back from the customer/client, to provide enough time for revisions and to re-submit the drawings for client approval.

In addition to manually setting this date, you can also allow the system to utilize the Default Days Allowed setting or make use of a formula.

image-20240122-204938.png

Date Returned

The date the customer/client returns the drawing regardless of whether they marked it ‘Approved’ or otherwise. This date can be set manually or set to automatically update when the status of the drawing gets changed (e.g., from Submitted to Approved or Revision).

...

Other Drawing Properties

Field Name

Explanation

Action

Allows users to select from a picklist of user-defined actions. Originally added for customers wishing to have an easy way to indicate “Who’s court the ball was in”.

Assigned

Click the ellipsis in the Assigned field to pop open a list of employee within your organization. User’s can filter by Department and/or Supervisor to select an employee to assign as the person responsible for completing the drawing.

image-20240123-035748.pngImage Added

Comment

The Comment field is a text field that allows for the user to write up to 500 characters in total.

Description

The Description field is designed to compliment the Name field. A place where you can provide up to 500 additional characters to augment the drawing name.

Group

Most commonly used for grouping/sorting building floors, project phases, or batches of rooms or like work orders. (e.g., “Level-1”, “Level-2”, and “Level-3”)

ID

The ID is a sequential number that is automatically assigned by Crows Nest when you create a new drawing record. The system assigns the next sequential number. Right click any column header to open the pop-up context menu and select “Hide This Column” move it off of your grid, and onto the Column Chooser, where columns you want to hide live.

Links

Click the (plus) button to add a new link.

You can link to external files, RFIs, Change Orders, and Phases (aka: Work Orders, Releases, SOWs, etc.)

image-20240123-042533.pngImage Addedimage-20240123-042939.pngImage Added

Name

At the time of creating a new drawing, you give your drawing a name. The Name field and the Type field are the only two required fields when creating a new drawing. The field name will also display icons that represent whether there are any notes and/or RFIs associated with the drawing record.

image-20240123-043618.pngImage Added

Note 1

Note fields 1, 2, and 3 are all text fields that allow up to 500 characters each.

These fields can be aliased (think: renamedto

Note 2

Note 3

Number

The Number field works in conjunction with the Project field. It displays the number of the drawing relative to its parent project.

Example: If a project has ten drawings, the number-1 in the Number field represents that particular project’s earliest drawing, and a number-10 would represent the most recently created drawing for that particular project.

Project

The Project field is a concatenation of the Project ID and the Project Description and are displayed as a hyperlink that will take you directly to the project when clicked.

Rev

When a drawing has been submitted to the client and is redlined and returned for further revisions, a new revision number is assigned by the system, so that a snapshot record is kept of all of the dates associated with the first iteration of the drawing. Subsequent revisions are sequentially numbered. Keeping separate dates by revision allow you to track the entire history of the drawing from initiation to completion.

Revision Note

When creating a revision, users are prompted to optionally provide an explanation, note, or reason for the revision.

Vendor

The Vendor field was added as a way for organizations to create a pick list of vendors for when they contract engineering/drafting services and want to be able to group/sort by vendor, or create custom reports that can be segmented by this field.

...

Anchor
ConfigureDrawings
ConfigureDrawings
Configuring Your Drawing Dates

Settings->Options->Drawings tab

...