The Drawing Form serves as a powerful tool with functionality akin to a pivot table. It allows you to effortlessly oversee and control all shop drawings within your entire project portfolio through a unified global view.

Organize your data to gain invaluable insights by arranging it in a manner that best suits your needs.
Take advantage of a wide array of grouping and sorting options, leveraging over a dozen properties associated with your drawing records. This flexibility empowers you to tailor your view, facilitating a seamless exploration of your project information.

Manage what you see, and how you see it.

Drawings-Grouping-Sorting.gif


Sorting, Grouping, Filtering, and Managing your Data Attribute Columns

Click the left mouse button on any column header to perform a quick sort based on that column. Alternatively, right-click to access a pop-up menu offering options for grouping, sorting, filtering, and controls to show/hide columns. You can also adjust column widths and configure conditional formatting through this menu.

image-20240120-220840.png

Drag-and-Drop Column Headers to Group your Data

Create groupings of your data by dragging-and-dropping combinations of columns to the area of the data grid above the column headers where it reads: “Drag a column header here to group by that column.”

To ungroup, right click a column header and select ‘Ungroup’ from the pop-up context menu, or simply drag the column back to the grid where you would like it.

image-20240121-222745.pngimage-20240122-192350.png


Drawing Properties (Attributes/Metadata)

Termed as properties, attributes, or metadata, the 23 built-in, standard fields serve as designated spaces to store intricate details about your drawings.

User-Defined Pick Lists

Pick List

Required/
Optional

Explanation

Type

Required

Select Drawing Type from Pick List. Types are created to align with your organization’s needs.

image-20240122-194202.png

Status

Required

Statuses represent the current state of the drawing along its lifecycle, such as “To Do”, “In Progress”, or “Done” and are represented visually on the Kanban board as “Swimlanes”. Statuses are created by your organization to align with desired workflow. New records inherit the status that is set to ‘Default’.

image-20240122-193234.png

Drawing Date Fields (Built-in)

In order for dates to be automatically set by formula or change in status, you must first configure settings in the Drawings and Project tabs of the Settings->Options. Click this link to see how to configure your Drawings for automation.

Dates

Explanation

Users can enter dates manually or allow the system to update them automatically, based on formulas.
All date fields associated with Drawings can be formulated.

Additionally, each of these system dates for tracking drawings can be aliased (e.g., “Target Date” can be labeled “Client Deadline”, or just “Target”, to shorten the width of the header.)

Target Date

The date you are intending to get the drawing to your customer/client. As with the other dates, this date can be set to compute automatically based on a formula.

image-20240122-213624.png

Date Started

The date the Engineer/Drafter begins work on the drawing. This date can be set manually or set to automatically update when the status of the drawing gets changed (e.g., from Not Started to In Progress).

Date Submitted

The date the drawing is submitted to the customer/client. This date can be set manually or set to automatically update when the status of the drawing gets changed (e.g., from In Progress to In Submitted).

Date Required

The date you want the drawing back from the customer/client, to provide enough time for revisions and to re-submit the drawings for client approval.

In addition to manually setting this date, you can also allow the system to utilize the Default Days Allowed setting or make use of a formula.

image-20240122-204938.png

Date Returned

The date the customer/client returns the drawing regardless of whether they marked it ‘Approved’ or otherwise. This date can be set manually or set to automatically update when the status of the drawing gets changed (e.g., from Submitted to Approved or Revision).


Configuring Your Drawing Dates

There are two ways that Drawing dates can be configured to calculate automatically:

Settings->Options->Drawings tab

image-20240122-232138.png

Step_01.png

User Defined Columns (UDCs):

Offer the flexibility to augment the 23 pre-existing, reserved drawing properties.
This functionality enables you to extend and tailor the database to better suit your specific needs. Create additional columns for:

  • Quantities - (Five additional fields available by default)

  • Text Field - (10 additional fields available by default)

  • Checkbox - (Five additional fields available by default)

  • Date - (Four additional Date fields are available by default. See #6 below for more details.

Step_02.png

Aliases:

If your company employs abbreviations, acronyms, or other jargon, consider assigning aliases to the names of the 23 database columns provided. This practice ensures that your team members can easily comprehend and recognize the terminology used in your organization.

Step_03.png

Starting Rev:

The Drawings form tracks drawings from initiation to completion. Typically, client-submitted drawings return with redlined revisions. The software captures original dates and initiates a new revision, numbering it based on the 'Starting Revision Number' in your settings. Therefore, if the Starting Revision is set to zero (0), your first revision will be “Revision 1”.

Step_04.png

Edit Formula:

Each of the built-in drawing dates fields can be set to calculate via a formula that utilizes either one of the built-in drawing dates, or any Project milestone dates that you have set on the Settings->Project tab.

For this example, the Target Date is calculated by adding 15 Work Days to the ‘Project Awarded’ date.

image-20240122-225902.png
Step_05.png

Change Date Calculation Order:

Custom formulas sequentially calculate drawing date fields. The "Change Date Calculation Order" setting empowers you to customize this sequence according to your organization's workflow by easily dragging and dropping the drawing lifecycle dates.

image-20240122-230618.png
Step_06.png

Managing Revisions

  1. When a drawing requires revisions to be made, the new tracking record will be set to the status that you select here, from your Status pick list.

  2. Choose which Labor Department should be the default department for tracking job costing as it relates to Drawings.

  3. This setting allows you to set a global default number of days used to automatically calculate the Required Date automatically.

  4. What drawing date should be used when a new revision is created? Typically, you’ll set this to the Date Started.

image-20240122-234556.png


Drawing Statuses must be created first. Therefore, before attempting to associate a drawing status with a Drawing Date field, the status record needs to exist.

Configuring Your Drawing Statuses

Once you have created your Drawing Statuses, you can associate each Drawing Dates with one or more status.

Here is a typical scenario:

A drawing begins in a status of “To Do”. When the Engineer, or Drafter begins work on the drawing, the status gets changed from “To Do”, to “In Progress”. The change in status triggers the “Date Started” to be populated with the computer’s system date.

Go to Settings->Options->Projects, select a Drawing Status from the Status dropdown, and associate it with a Drawing Date, by right-clicking in the ‘Dates Triggered for Status’ panel. Repeat this process for the other dates you wish to automatically update on a status change.

Once these settings have been established, any change in your drawing status, will automatically update its corresponding drawing date field.

SettingDrawingStatuses.gif