Release: May 18, 2020
Fix: Contract Value – Leaving the contract value field on the Project form would cause an error if a currency symbol were included.
Fix: Estimate Customize Product – The customize product window was not honoring the currency format settings.
Blubeam Import to Estimate – When importing an XML file from Bluebeam, default UDC values and default customizations are now honored. The Document field is no longer required for instances where the XML file is generated from an Excel document instead of from Bluebeam.
Default UDC Values for Estimates, Groups and Projects – You can now set default values for UDC fields for new records when adding Projects, Estimates or Estimate Groups. The default values can be set on the All tab under Settings->Options. Search for “udc default” to find them. The setting names will be like the following format: ProjectUDCText1Default.
Fix: Estimate Material Substitution – If the Modifier was substituted, then subsequent substitutions were not working.
PO Receive All to Default Inventory Location – When using the Receive All Remaining options to receive PO Items and the received item has a default inventory location it will be logged in the inventory transaction automatically.
New Report – Calendar\Project by Week. Prompts for date and shows a 5-day calendar listing each Project with Date1 on that date.
New Report – Project Cost\Labor\Budget vs Actual, Hours. Dynamically select grouping hierarchy when running the report (Department, Operation, Phase, Employee).